About the Project
Collin County is the sixth-highest populated county in Texas and a vital part of the rapidly growing Dallas-Fort Worth Metroplex. With a forecasted population growth of 70% from 2026 to 2050, planning for local and regional connectivity is imperative to development.
Collin County is studying Segment 5 of the Collin County Outer Loop, a corridor of approximately 21 miles, from SH 121 to US 380 to identify right-of-way (ROW) needs and revisit the study completed on this segment in 2007. The 21-mile segment is anticipated to utilize a 500-foot ROW with two mainlanes in each direction and two-lane frontage roads in each direction. The Collin County Outer Loop makes up a portion of the currently developing Regional Outer Loop, made up of projects being conducted in Collin, Denton, Kaufman and Rockwall counties.
Legend
Light purple color : Study Area
Project Objectives
- Enhanced Mobility and Safety
- Cost Effectiveness
- Engineering Feasibility
- Minimizing Environmental Impacts
Project Timeline/Key Milestones
Public Meeting #2 - June 3, 2026 - July 6, 2026
- Notice of Public Meeting #2
- Meeting Location Map
- Study Fact Sheet
- Presentation and Script
- Exhibit Boards
- Alternative Roll Plots
Public Meeting #1 - November 13, 2025 - December 15, 2025
Collin County conducted a virtual public meeting from November 13, 2025 to December 15, 2025 to share information about the project and gather feedback from the public on the alignment variations under consideration.
Thank you for your interest in this project!
Background
The technically preferred alignment was approved in 2007. No other activity has been completed on this segment to date.